Nr | Parameter2) | Description | Comments |
1 | Radiocommunication service | - | - |
2 | Application | Tracking, tracing and data acquisition | Data networks, such as for utilities or other applications for the purpose of data acquisition. For network access points please refer to RIR1003-08. |
3 | Frequency band | 870 - 873 MHz | - |
4 | Channelling | - | - |
5 | Modulation / Occupied bandwidth | - / max. 200 kHz. | - |
6 | Direction / Separation | - | - |
7 | Transmit power / Power density | Max. 500 mW e.r.p. | - |
8 | Channel access and occupation rules | Duty cycle max. 2.5 % and APC required. | Adaptive Power Control (APC) is able to reduce a link transmit power from its maximum to less or equal to 5 mW. Alternatively to APC, other mitigation techniques which achieve at least an equivalent level of spectrum compatibility may be used. All nomadic and mobile devices within the data network shall be controlled by a master network access point (NAP). |
9 | Authorisation regime | Switzerland: License exempt. Liechtenstein: General authorisation. | Operation on NIB / NPB. (Non interference basis / non protection basis). |
10 | Additional essential requirements | - | - |
11 | Frequency planning assumptions | EN 303 204 | - |
12 | Planned changes | - | - |
13 | Reference | EN 303 204 /-/ ERC/REC 70-03, Annex 2. | Effective use of spectrum / ECC Decisions / ECC Recommendations. |
14 | Notification number | G/TBT/N/CHE/242 2020/9501/CH | - |
15 | Remarks | EN 301 489-3 | The term data network refers to several short range devices, including the network access point, as network components and to the wireless connections between them. |
Normative part: 1 to 11
Informative part: Nr 12 to 15
1) RIR for similar and/or other applications are available under: https://www.bakom.admin.ch/bakom/en/home/frequenzen-antennen/nationaler-frequenzzuweisungsplan/schnittstellen-anforderungen.html
2) For explanations and legal status, please refer to basis document 784.101.21 / RIR0000
© OFCOM (Swiss Federal Office of Communications)