Switzerland and the Principality of Liechtenstein
Radio Interface Regulation

784.101.21 / RIR08081)
MSS Earth stations

RIR0808-13
MSS Earth stations
148 - 150 MHz, 400 MHz
Mobile Earth Stations (MES) operating with NGSO MSS
Edition 5.0 / 01.05.2022

Nr Parameter2)DescriptionComments
1Radiocommunication serviceMobile-satellite-
2ApplicationMSS Earth stationsNon-voice Mobile Earth Stations (MES) operating with NGSO MSS systems.
3Frequency bandA: 148.00 - 149.90 MHz
B: 149.90 - 150.05 MHz
C: 399.90 - 400.05 MHz
RX: 137.00 - 138.00 MHz, Downlink
RX: 400.15 - 401.00 MHz, Downlink
TX: 148.00 - 149.90 MHz, Uplink
TX: 149.90 - 150.05 MHz, Uplink
TX: 399.90 - 400.05 MHz, Uplink
4Channelling--
5Modulation / Occupied bandwidthAccording to ERC/DEC/(99)06, Annex 2.-
6Direction / Separation--
7Transmit power / Power densityAccording to ERC/DEC/(99)06, Annex 2.-
8Channel access and occupation rulesAccording to ERC/DEC/(99)06, Annex 2.-
9Authorisation regimeSwitzerland: License exempt.
Liechtenstein: No individual assignment required.
For this application a CIV/MIL coordination is required before every frequency assignment.
Switzerland: Terminals are license exempt on the condition that the terminals are under the control of a network for which a valid spectrum license for the Swiss territory is required.
Liechtenstein: The exemption from the individual assignment requirement only applies under the condition and in the framework of a valid license for the Liechtenstein territory that includes the use of individual customer terminals.
10Additional essential requirements--
11Frequency planning assumptionsERC/DEC/(99)06-
12Planned changes--
13ReferenceEN 301 721 / ERC/DEC/(99)06 /-.Effective use of spectrum / ECC Decisions / ECC Recommendations.
14Notification numberG/TBT/N/CHE/267
2022/9501/CH
-
15RemarksEN 301 489-20. ECC Report 322.-

Normative part: 1 to 11
Informative part: Nr 12 to 15

1) RIR for similar and/or other applications are available under: https://www.bakom.admin.ch/bakom/en/home/frequenzen-antennen/nationaler-frequenzzuweisungsplan/schnittstellen-anforderungen.html
2) For explanations and legal status, please refer to basis document 784.101.21 / RIR0000