Switzerland and the Principality of Liechtenstein
Radio Interface Regulation

784.101.21 / RIR08061)
FSS Earth stations

RIR0806-23
GSO ESIM
14.00 - 14.50 GHz
Land based ESIM operating with GSO FSS
Edition 2.0 / 01.01.2022

Nr Parameter2)DescriptionComments
1Radiocommunication serviceFixed-satellite-
2ApplicationESIMLand based Earth Stations in-motion (ESIM) operating with GSO FSS networks.
3Frequency band14.00 - 14.50 GHzReceive frequency band (space-to-Earth): 10.70 - 12.75 GHz.
The receive band 10.70 - 11.70 GHz is co-primary used with the FS under the terms of sufficient geographical separation and uncoordinated FSS Earth stations operate in this band on a non protected basis.
4Channelling--
5Modulation / Occupied bandwidth--
6Direction / Separation--
7Transmit power / Power densitymax. 54.5 dBW e.i.r.p.-
8Channel access and occupation rulesAccording to ECC/DEC/(18)04.In frequency band 14.25 - 14.5 GHz protection of fixed service according ECC/DEC/(18)04 Annex 1.
In frequency band 14.47 - 14.5 GHz protection of radio astronomy according ECC/DEC/(18)04 Annex 2.
9Authorisation regimeSwitzerland: License exempt.
Liechtenstein: No individual assignment required.
Switzerland: Terminals are license exempt on the condition that the terminals are under the control of a network for which a valid spectrum license for the Swiss territory is required.
Liechtenstein: The exemption from the individual assignment requirement only applies under the condition and in the framework of a valid license for the Liechtenstein territory that includes the use of individual customer terminals.
10Additional essential requirements--
11Frequency planning assumptionsEN 302 977, EN 302 448, ECC/DEC/(18)04.-
12Planned changes--
13ReferenceEN 302 977, EN 302 448 / ECC/DEC/(18)04 /-.Effective use of spectrum / ECC Decisions / ECC Recommendations.
14Notification numberG/TBT/N/CHE/262
2021/9504/CH
-
15RemarksEN 301 489-20. ECC Report 272.-

Normative part: 1 to 11
Informative part: Nr 12 to 15

1) RIR for similar and/or other applications are available under: https://www.bakom.admin.ch/bakom/en/home/frequenzen-antennen/nationaler-frequenzzuweisungsplan/schnittstellen-anforderungen.html
2) For explanations and legal status, please refer to basis document 784.101.21 / RIR0000