Nr | Parameter2) | Description | Comments |
1 | Radiocommunication service | Fixed | - |
2 | Application | Point-to-Point | FDD / TDD. |
3 | Frequency band | 64.010 - 65.990 GHz | - |
4 | Channelling | Max. 250 MHz | FDD: 30 MHz to 240 MHz TDD: 50 - 250 MHz (max. 5 aggregated slots) |
5 | Modulation / Occupied bandwidth | - / OBW: Max. 240 MHz (FDD) / Max. 250 MHz (TDD) | - |
6 | Direction / Separation | 990 MHz. - | FDD. TDD. |
7 | Transmit power / Power density | Max. 55 dBW e.i.r.p. for antenna gain of min. 50 dBi. Max. 30 dBW/MHz e.i.r.p. spectral density. | The max. e.i.r.p. has to be reduced, if the antenna gain is lower than 50 dBi. Refer to EN 302 217-2 Annex I. |
8 | Channel access and occupation rules | - | - |
9 | Authorisation regime | Switzerland: License exempt. Liechtenstein: General authorisation. | Operation on NIB / NPB. (Non interference basis / non protection basis). The equipment is not permitted to cause harmful interference to other radio services. OFCOM and AK Liechtenstein do not maintain a co-ordinated frequency planning and link registration for this application. By setting up a new 64 - 66 GHz link, the operator is fully responsible, that this link does not generate interference to other installations. The equipment has to be switched off immediately in the case of interference with other services. |
10 | Additional essential requirements | - | - |
11 | Frequency planning assumptions | EN 302 217-2. | Limits of transmitter power spectral density: Refer to EN 302 217-2, Annex I.3.3. ===== Min. link distance = 50 m. ===== Class 2 or class 3a antenna. Minimum antenna gain = 30 dBi. Linear (horizontal or vertical) polarization. Antenna radiation pattern envelope (RPE) according to EN 302 217-4, Figure 34 or 35. |
12 | Planned changes | - | - |
13 | Reference | EN 302 217-2 /-/-. | Effective use of spectrum / ECC Decisions / ECC Recommendations. |
14 | Notification number | G/TBT/N/CHE/274 2022/9504/CH | - |
15 | Remarks | EN 301 489-4 | - |
Normative part: 1 to 11
Informative part: Nr 12 to 15
1) RIR for similar and/or other applications are available under: https://www.bakom.admin.ch/bakom/en/home/frequenzen-antennen/nationaler-frequenzzuweisungsplan/schnittstellen-anforderungen.html
2) For explanations and legal status, please refer to basis document 784.101.21 / RIR0000
© OFCOM (Swiss Federal Office of Communications)