Nr | Parameter2) | Description | Comments |
1 | Radiocommunication service | Fixed | - |
2 | Application | Point-to-Point | TDD |
3 | Frequency band | 57.000 - 58.000 GHz | - |
4 | Channelling | 50 MHz | - |
5 | Modulation / Occupied bandwidth | - / OBW: 50 MHz. | - |
6 | Direction / Separation | - | TDD |
7 | Transmit power / Power density | Max. 25 dBW e.i.r.p. | Limits of transmitter power spectral density: Refer to EN 302 217-2 Annex H. |
8 | Channel access and occupation rules | Interference avoidance according to EN 302 217-2. | - |
9 | Authorisation regime | Switzerland: License required. Liechtenstein: Individual assignment required. | OFCOM and AK Liechtenstein do not maintain a co-ordinated frequency planning for the 58 GHz band. Therefore an interference protection will not be guaranteed. By setting up new 58 GHz links, the operator is fully responsible, that these do not generate interference to other microwave links in the same area. No new assignments. |
10 | Additional essential requirements | - | - |
11 | Frequency planning assumptions | EN 302 217-2. | Min. link distance = 50 m. ===== Class 2 antenna. Min. antenna gain = 30 dBi. Linear (horizontal or vertical) polarization. Antenna radiation pattern envelope (RPE) according to EN 302 217-4, Figure 34. |
12 | Planned changes | - | - |
13 | Reference | EN 302 217-2 /-/-. | Effective use of spectrum / ECC Decisions / ECC Recommendations. |
14 | Notification number | G/TBT/N/CHE/274 2022/9504/CH | - |
15 | Remarks | EN 301 489-4 | - |
Normative part: 1 to 11
Informative part: Nr 12 to 15
1) RIR for similar and/or other applications are available under: https://www.bakom.admin.ch/bakom/en/home/frequenzen-antennen/nationaler-frequenzzuweisungsplan/schnittstellen-anforderungen.html
2) For explanations and legal status, please refer to basis document 784.101.21 / RIR0000
© OFCOM (Swiss Federal Office of Communications)